Unconditional Final Lien Waiver for Residential Real Property (RSMo 429.016(27)). Sign it after final payment on a residential project has cleared. It waives every lien right on the property, including for later work under agreements signed before it.
Free, no account. Nothing you type is stored.
We are software, not legal or tax advisors. Verify against your state statute and your accountant.

Published · 4 min read · By Ludvig Bergerud, builder of PayAppCheck

Missouri prescribes one statutory lien waiver form (Missouri Revised Statutes section 429.016). This page lists it, when a subcontractor signs it, what the statute requires on the page and the blanks it has, with a form that fills the statutory text with your figures and downloads the PDF.

The form the statute prescribes

Unconditional Final Lien Waiver for Residential Real Property (RSMo 429.016(27)). Sign it after final payment on a residential project has cleared. It waives every lien right on the property, including for later work under agreements signed before it.

What Missouri Revised Statutes section 429.016 requires

The section applies to mechanic's liens on residential real property as defined in subsection 2: new residential construction, not owner occupied repairs of four units or fewer.

It prescribes one form, the unconditional final lien waiver (subsection 27). Partial and conditional waivers are allowed but have no statutory form, so this tool prints only the final one.

The unconditional final waiver is valid even if the promised payment never arrives (subsection 29). Sign it only after final payment has cleared.

The claimant's legal name and the name, title, address and telephone number of the person signing go next to the signature, with the date signed.

The blanks each form has

Unconditional Final Lien Waiver for Residential Real Property: Claimant (your company), Address, Property description, Date signed, Name of the person signing, Title of the person signing, Telephone.

Fill it from your pay app

Build the pay app in the free builder, and at the end of the form press Make the statutory waiver. Your company, the owner or GC, the project, the period to and the current payment due come over from the G702 into the form, you pick the state and the form, and Send to your GC attaches the waiver to the pay app it belongs to.

We are software, not legal or tax advisors. Verify against your state statute and your accountant.

Build the pay app the waiver goes with, free, and download both.

Make a pay app