Free change order form: AIA-style G701 lines in Excel, and a blank PDF to print

A construction change order form as a free Excel workbook that adds up the new contract sum, or a blank PDF to print and sign.

Download the free change order form

The form and a change order log in one .xlsx. The new contract sum adds up as you type. Enter your email and it downloads.

Your address is never sold or given to anyone else for their marketing. Or download the .xlsx directly.

Or print it blank

The same form as a one-page PDF, empty, to fill in by hand and sign. No email.

Blank printable PDF
  • Opens in Excel, Numbers and Google Sheets, no macros
  • Styled after the AIA G701, not affiliated with the AIA
  • Free, no card

Published · 5 min read · By Ludvig Bergerud, builder of PayAppCheck

A change order form records one approved change to a construction contract: what changed, what it adds to or deducts from the contract sum, and how many days it adds to the schedule. Five lines carry the original contract sum to the new one, and the change takes effect when the parties sign.

What goes on a change order form

  • The contract it changes. The project, what the contract is for, and the contract date.
  • The change order itself. Its number, counted from 1 on each contract, and its date.
  • The parties. The owner or GC, the contractor or subcontractor, and the architect when the contract has one.
  • A description of the change. What is added, removed or revised, with the drawing, RFI or proposal it comes from.
  • The contract sum, in five lines, below.
  • The contract time. The days added or deducted, and the new date of substantial completion.
  • Signatures. One block per party: company, signature, printed name and title, date.

The five contract sum lines, with an example

A plumbing subcontract of $120,000 has one earlier change order for $4,500. Change order 2 adds a floor drain for $3,200 and three days.

LineAmount
1. Original contract sum$120,000.00
2. Net change by previous change orders$4,500.00
3. Contract sum before this change order (1 + 2)$124,500.00
4. This change order: add or deduct$3,200.00
5. New contract sum (3 + 4)$127,700.00

Line 2 is the net of every change order approved before this one: additions less deductions. Line 4 is positive for an addition and negative for a deduction, so a credit change order lowers Line 5. The contract time works the same way: a substantial completion date of 03/12/2027 plus three days becomes 03/15/2027.

What you download: the form and a change order log

  • The Excel workbook (.xlsx). A Change order sheet where you type Lines 1, 2 and 4 and Lines 3 and 5 compute, with the new completion date, and a Change order log sheet with one row per approved change order and a running net change. Enter your email in the download box at the top and it downloads straight away.
  • The blank printable PDF. The same form on one page, empty, with a box for each amount and three signature blocks: download the blank change order PDF.

Neither is the AIA form, and PayAppCheck is not affiliated with the AIA. They are independently built, with the same lines and arithmetic as a G701 change order.

After it is signed: the next pay application

An approved change order moves two things on the next G702 and G703.

  • G702 Line 2, net change by change orders, becomes the total of every approved change order. In the example that is $4,500 + $3,200 = $7,700, and Line 3, the contract sum to date, becomes $127,700. The log sheet totals Line 2 for you.
  • The schedule of values. Column C of the G703 has to total Line 3. Add the change order as its own line at the bottom, or adjust the line it changes, then bill against it like any other line.

A pay app whose Line 2 moved while its schedule did not is one of the reasons pay applications get rejected. The free G702/G703 builder checks Line 3 against the Column C total as you type, and the free G702/G703 Excel template has the same check as a formula.

Make the pay app online

Change orders on a subcontract

On a subcontract the two parties are the general contractor and the subcontractor, and the five lines run on the subcontract sum. The form here names the parties “Owner or GC” and “Contractor or subcontractor” so one form covers both. The sub bills the change on its own pay application to the GC, in its own Line 2.

When the price is not agreed yet

A change order is an agreement: every party has signed off on the price and the time. Work the owner directs before the price is settled is handled by a different document under most contracts, such as a construction change directive, and becomes a change order once the price and time are agreed. Which document applies, and when the work can be billed, is set by the changes clause of your contract. We are software, not legal advisors: read the contract or ask your attorney.

Questions people ask

Is this change order form free?

Yes. Enter an email and the Excel workbook downloads straight away, or use the direct download link under the form. The blank printable PDF needs no email. There is no trial, no card, and no limit on how you use either, including on commercial projects.

Is this the AIA G701 form?

No. It is an independently built form with the same lines and arithmetic as a G701 change order: the original contract sum, the net change by previous change orders, the contract sum before this change order, this change order, and the new contract sum, then the change in contract time. PayAppCheck is not affiliated with the AIA. If your contract requires the official document, buy it from AIA Contract Documents.

Who signs a change order?

Every party the contract names for changes. On an owner and contractor agreement with an architect, that is the owner, the contractor and the architect. On a subcontract it is the general contractor and the subcontractor. The form here has three signature blocks; leave the architect block empty when the contract has none.

Where does a change order go on a G702 pay application?

In Line 2, net change by change orders. Line 2 is the total of every approved addition less every approved deduction, and Line 3, the contract sum to date, is Line 1 plus Line 2. The change order log in the workbook totals Line 2 for you.

Does a change order change the schedule of values?

Yes. Column C of the G703 has to total G702 Line 3, so once Line 2 changes the schedule changes with it. Add the change order as its own line at the bottom of the schedule, or adjust the line it changes, and bill against it like any other line.

Can I bill for a change order before it is signed?

Only an approved change order changes the contract sum, so only an approved one belongs in Line 2 and in Column C. Work done ahead of a signed change order is billed the way your contract says pending changes are handled. Read its changes clause, and ask the party who certifies your pay applications.

Bill the change order on your next pay app, free, and check that it ties.

Make a pay app